Edit this essay
only $12.90/page

Implementation Plan Essay Sample

Implementation Plan Pages
Pages: Word count: Rewriting Possibility: % ()

Premier Network Solutions will be constructing an entire network infrastructure for the  company. This documentation will show the methods and processes used to implement  the strategies and procedures.

Schedule
Purpose: Premier Technology will be developing the network. The implementation
Projected start time will be Nov 12, 2012, Jan 3, 2013 will be the projected finish time.

Cabling
Premier Technology will begin installation and setup as soon as the cabling structures
Have been built in accordance with the RFP. The purchase of the equipment should be made at least 3 weeks prior to start of project.

LAN
LAN equipment will be purchased 2 weeks prior to start date. The LAN will be complete
Once all the LAN equipment has been installed and properly tested at each location in
Accordance with the proper Quality Assurance measures.

WAN
Premier Technology will order, install and test all of the WAN equipment. Purchasing of
The equipment will overlap with the LAN installation process. Premier Technology will provide fast and effective setup so that all the locations are up and running. All routers  and device will receive Quality Assurance testing that will ensure that the configurations comply with the guidelines.

Active Directory
All of the active directory hardware will be thoroughly tested to meet the Quality
Assurance checks. Premier Technology will install and configure Active Directory.
The AD database will be constructed with the proper forest/domain in accordance with
The RFP.

Exchange
Premier Technology will implement the Microsoft Exchange infrastructure after Active Directory services have been installed, configured and properly tested. The exchange Infrastructure will follow the guidelines in accordance with the RFP.

Search For The related topics

  • plan