Introduction of TOPIC

A civil engineer is a person who practices civil engineering; the application of planning, designing, constructing, maintaining, and operating infrastructures while protecting the public and environmental health, as well as improving existing infrastructures that have been neglected. Originally, a civil engineer worked on public works projects and was contrasted with themilitary engineer,[citation needed] who worked on armaments and defenses. Over time, various branches of engineering have become recognized as distinct from civil engineering, including chemical engineering, mechanical engineering, and electrical engineering, while much of military engineering has been absorbed by civil engineering.

In some places, a civil engineer may perform land surveying; in others, surveying is limited to construction surveying, unless an additional qualification is obtained. On some U.S. military bases, the personnel responsible for building and grounds maintenance, such as grass mowing, are called civil engineers and are not required to meet any minimum educational requirements.

Civil engineers usually practice in a particular specialty, such as construction engineering, geotechnical engineering, structural engineering, land development, transportation engineering, hydraulic engineering, and environmental engineering. Some civil engineers, particularly those working for government agencies, may practice across multiple specializations, particularly when involved in critical infrastructure development or maintenance.

http://en.wikipedia.org/wiki/Civil_engineer#Specialization

Architect:Job description

Architects work in the construction industry and are in

volved with designing new buildings, extensions or alterations to existing buildings, or advising on

Sorry, but full essay samples are available only for registered users

Choose a Membership Plan
the restoration and conservation of old properties. They can work on individual buildings or on large redevelopment schemes, and can be responsible for the design of the surrounding landscape and spaces.

Architects work closely with their client and users to make sure that projected designs match their needs and are functional, safe and economical. They usually control a project from start to finish and work with a number of construction professionals, including surveyors and engineers, producing drawings and specifications that the construction team works to.

Typical work activities

Architects are involved from the earliest stages of a building project, which can start with developing ideas with the client, establishing budgets, assessing the needs of the building and its users, and its impact within the local environment.

They assist with site selection and work closely with contractors on site, ensuring that works are carried out to specific standards and that, above all, the building is sustainable, functional and aesthetically pleasing.

Work activities vary but typically include:

• discussing the objectives, requirements and budget of a project; • consulting with other professionals about the design of an environment; • preparing and presenting feasibility reports and design proposals to the client; • advising the client on the practicality of their project; • using IT in design and project management, specifically using computer-aided design software; • keeping within financial budgets and deadlines;

• producing detailed workings, drawings and specifications; • specifying the nature and quality of materials required;
• preparing tender applications and presentations;
• negotiating with contractors and other professionals;
• preparing applications for planning and building control departments;
• preparing tender documents for contracts;
• project managing and helping to coordinate the work of contractors;
• controlling a project from start to finish;
• regular site visits to check on progress, ensuring that the project is running on time and to budget;
• resolving problems and issues that arise during construction
; • ensuring that the environmental impact of the project is managed.

http://www.prospects.ac.uk/architect_job_description.htm

We can write a custom essay on

Civil Engineer vs. Architect Essay Sample ...
According to Your Specific Requirements.

Order an essay

You May Also Find These Documents Helpful

Forms of Substructure

Dry compact gravel, or gravel and sand subsoil’s are usually suitable for strip foundations. Mostly 700mm to 1000mm deep foundations are acceptable as long ground has suitable bearing capacity. If the water level is high than the bearing capacity will reduce, so in this case foundations should keep higher than normal. In this condition a shallow and wide strip foundation can be used, and reinforced foundations can also be useful. As the safe bearing capacity of compact gravel sub soil = 100kN/m² (Chudley & Greeno, 2010) This safe bearing capacity is for 1 m², for .5 m² it will be 50kN. W = LoadBearing Capacity W = 68kN/m ÷100kN/m²1000mm Required Width = 680mm It can also be chose from table provided, according to which because loading size is nearly 70kN/m for which 650mm wide foundation is required. As per table accurate measure can be: 650mm70kN/m×68kNm=631 mm So foundation width can...

Close Out Requirements

The practice of project close-out finalizes all project activities completed across all phases of the project to formally close the project and transfer the completed or cancelled project as appropriate. According to the PMBOK, the close project or phase is the process of finalizing all activities across all of the management process groups to formally complete the project or phase (2008, p.65). When closing a project, PMs will review all prior information from the previous phase to ensure that all requirements are met. The Project Closeout Phase is the last phase in the project lifecycle. Closeout begins when the user accepts the project deliverables and the project oversight authority concludes that the project has met the goals established. The major focus of project closeout is administrative closure and logistics. Project closeout includes the following key elements: • Turnover of project deliverables to operations • Redistributing resources—staff, facilities, equipment, and automated...

Hearing Protection in Construction

            Construction sites are one of the noisiest workplaces there is.  Workers in these sites are at risk to develop noise – induced hearing loss (NIHL) while on the job.  Hearing – impaired workers are not the only ones affected, though.  In effect, their co – workers are imperiled too because of their condition (Glascock 2). In this regard, we can state that although damaging noise is part of the construction workplace it must never be the price to pay in the job site.             One of the most prevalent hazards to health particularly in construction sites, is noise exposure.  Prolonged exposure can trigger permanent inner ear injuries beyond medical or surgical repair.  Noises that can inflict permanent injuries occur over a long period of time, say for instance, 8 hours per work day over ten years or longer.  In most cases, NIHL is gradual which is why it seems...

Popular Essays

logo

Emma Taylor

online

Hi there!
Would you like to get such a paper?
How about getting a customized one?