Introduction of TOPIC

Dry compact gravel, or gravel and sand subsoil’s are usually suitable for strip foundations. Mostly 700mm to 1000mm deep foundations are acceptable as long ground has suitable bearing capacity. If the water level is high than the bearing capacity will reduce, so in this case foundations should keep higher than normal. In this condition a shallow and wide strip foundation can be used, and reinforced foundations can also be useful. As the safe bearing capacity of compact gravel sub soil = 100kN/m² (Chudley & Greeno, 2010) This safe bearing capacity is for 1 m², for .5 m² it will be 50kN. W = LoadBearing Capacity

W = 68kN/m ÷100kN/m²1000mm
Required Width = 680mm
It can also be chose from table provided, according to which because loading size is nearly 70kN/m for which 650mm wide foundation is required. As per table accurate measure can be:
650mm70kN/m×68kNm=631 mm
So foundation width can be 635 mm wide or for safety it can be increase up to 650mm. As the plot is adjacent to coast it is difficult to pump the water outside. Piled foundations can be another option which can be use to do the construction in coastal environment.

* Site 2
As the subsoil is Clay, Short Bored Piles foundation can be used it will be suitable for two story domestic building. As the plot was used as an orchard before so the moisture which was stopped due to trees will come again and cause soil swelling. So heave will occur on this type of plot. Due to heave deeper foundations need to build, by this cracks will not occur in foundations. Again p

ile foundations can be use on this type of land. Water can be pump out from the site. (Chudley &

Sorry, but full essay samples are available only for registered users

Choose a Membership Plan
Greeno, 2010) Heave is upward movement of soil. It is the process when moisture added to soil which cause the expansion of soil. If there is any foundation is available than that superstructure will move upward, it only occur in clayey soils. As the safe bearing capacity of clay subsoil = 80kN/m² (Chudley & Greeno, 2010) This safe bearing capacity is for 1 m², for .5 m² it will be 40kN. W = LoadBearing Capacity

W = 46kN/m ÷80kN/m²1000mm
Required Width = 575mm
Assumed clay type is firm.
It can also be chose from table provided, according to which because loading size is nearly 50kN/m for which 600mm wide foundation is required. As per table accurate measure can be:
600mm50kN/m×46kNm=552 mm
So foundation width can be 575 mm wide or for safety it can be increase up to 600mm If the pile foundations choose, diameter of pile will be 254mm and length of 3.05 Lm will suitable.

* Site 3
As the structure is single story framed building so reinforced raft type foundation may be suitable for this. Contamination can be stop by many ways, like soil washing and Vapour extraction. “Columns have brick and block work infill panel walls, those walls are ties cast into columns. The head of every infill panel should have a compressible joint to allow for any differential movements between the frame and panel”. (Chudley & Greeno, 2010)

Safe bearing capacity can be calculated after stopping soil contamination. Geographical survey need to carry out by which more detail of soil classification bearing capacity can be found. Assume the bearing capacity of subsoil is 85kN/m²

area of base=Loading Bearing Capacity
area of base=98kN 85kN/m²
area of base=1.153m²
each side=1.153m²
each side=1.07m

For safety it can be 1100mm for each side of column base foundation required.

* Precautionary actions and temporary works

Following works need to carry out when start a construction site:
* Site Survey
* Soil Assessment and investigation
* Temporary outer fence or boundary wall required
* Temporary storage area
* Temporary site offices & first aid rooms
* Temporary electricity, internet and telephone connection required
* Temporary toilets and drainage system
* Temporary mess and canteen areas
* Temporary pedestrian walk areas
* Temporary traffic management
* Temporary scaffold storage area
* Permanent water supply (i.e. Gate man and CCTV installation)
* Temporary lights
* Need to make sure that site is safe for work
* If any existing building available need to make sure it is safe to work around that existing building.

Bibliography

Chudley, R., & Greeno, R. (2010). BUILDING CONSTRUCTION. Oxford: Elsevier Ltd.

We can write a custom essay on

Forms of Substructure Essay Sample ...
According to Your Specific Requirements.

Order an essay

You May Also Find These Documents Helpful

Civil Engineer vs. Architect

A civil engineer is a person who practices civil engineering; the application of planning, designing, constructing, maintaining, and operating infrastructures while protecting the public and environmental health, as well as improving existing infrastructures that have been neglected. Originally, a civil engineer worked on public works projects and was contrasted with themilitary engineer,[citation needed] who worked on armaments and defenses. Over time, various branches of engineering have become recognized as distinct from civil engineering, including chemical engineering, mechanical engineering, and electrical engineering, while much of military engineering has been absorbed by civil engineering. In some places, a civil engineer may perform land surveying; in others, surveying is limited to construction surveying, unless an additional qualification is obtained. On some U.S. military bases, the personnel responsible for building and grounds maintenance, such as grass mowing, are called civil engineers and are not required to meet any minimum educational requirements. Civil engineers usually...

Close Out Requirements

The practice of project close-out finalizes all project activities completed across all phases of the project to formally close the project and transfer the completed or cancelled project as appropriate. According to the PMBOK, the close project or phase is the process of finalizing all activities across all of the management process groups to formally complete the project or phase (2008, p.65). When closing a project, PMs will review all prior information from the previous phase to ensure that all requirements are met. The Project Closeout Phase is the last phase in the project lifecycle. Closeout begins when the user accepts the project deliverables and the project oversight authority concludes that the project has met the goals established. The major focus of project closeout is administrative closure and logistics. Project closeout includes the following key elements: • Turnover of project deliverables to operations • Redistributing resources—staff, facilities, equipment, and automated...

Hearing Protection in Construction

            Construction sites are one of the noisiest workplaces there is.  Workers in these sites are at risk to develop noise – induced hearing loss (NIHL) while on the job.  Hearing – impaired workers are not the only ones affected, though.  In effect, their co – workers are imperiled too because of their condition (Glascock 2). In this regard, we can state that although damaging noise is part of the construction workplace it must never be the price to pay in the job site.             One of the most prevalent hazards to health particularly in construction sites, is noise exposure.  Prolonged exposure can trigger permanent inner ear injuries beyond medical or surgical repair.  Noises that can inflict permanent injuries occur over a long period of time, say for instance, 8 hours per work day over ten years or longer.  In most cases, NIHL is gradual which is why it seems...