We use cookies to give you the best experience possible. By continuing we’ll assume you’re on board with our cookie policy

Procedure Spot Speed Traffic Engineering Essay Sample

essay
  • Pages: 2
  • Word count: 478
  • Rewriting Possibility: 99% (excellent)
  • Category: engineering speed

Get Full Essay

Get access to this section to get all help you need with your essay and educational issues.

Get Access

Introduction of TOPIC

1. We have identified a perfect spot for doing this field work. We have chosen in front of the bus stop at Polytechnics heading to Slim River.

2. We decided to do at there because it situated far away from road shoulder so it easy and safe for us to observe and captured the time elapsed.

3.2Setting up study length

1. We chose 54 m of study length because the traffic stream average speed in front of Polytechnics Sultan Azlan Shah is 60km/h.

2. We used cone as a marker so it will easy to capture the speed limit when the vehicles pass by the marker.

3. Three of our group members were assigned to measure and put the cone at the road.

3.3 Collection of data

1. All of our group members were assigned a different role in this field work.

2. Th

ere are two observers, two data collector, two stop watchers and another person was assigned to take

Sorry, but full essay samples are available only for registered users

Choose a Membership Plan
a picture of this field work.

3. We have divided into three persons per team. The first team was assigned to take the time elapsed from the north bound direction and another team was assigned to take the time elapsed from the south bound direction.

4. The first observer from the first team was used the technic of waving hand to the first stop watcher to give the signal of vehicles passing by the
first marker. The first stop watcher starts to take the time until the vehicle passing the second marker. The time was then stopped.

5. The first data collector start to collecting the time elapsed of the vehicles.

6. The second team was assigned to take the time elapsed from the north bound direction. The second observer was used the technic of blowing the whistle to the second stop watcher to give signal once the car passing by the first marker.

7. The second stop watcher started to take the time elapsed until the vehicle passing the second marker. The time was taken and was tabulated in the data form by the data collector.

8. The procedure was repeated until the number of vehicles passing by the marker up to 100 per direction.

9. Once the we have captured the time elapsed, we can calculate the speed limit of the vehicles by using the formula ;

V = L / T

Where; L – length (metre)

T – Time elapsed (second)

We can write a custom essay on

Procedure Spot Speed Traffic Engineering Essay Sam ...
According to Your Specific Requirements.

Order an essay

You May Also Find These Documents Helpful

Linear equation & Matrices

Linear equation is an equations are equations between two variables that make a straight line when it is graphed. There are many different kind of linear equations, one of them is Matrix (Matrices for plural). Matrices are a set of numbers and expressions arranged in rows and columns and are enclosed with square brackets. They can be added, subtracted and multiplied. Matrices can be used to in many different fields of work such as Engineering and even Business. They can be used to show the number of staff and employees in that work place or what two different branches are selling and how each of them are doing in terms of sales. Matrices are commonly used when we have to deal with several variables at the same time. They can also be used in our daily life when we need to calculate the battery power outputs and the conversion of...

Real Engineering Science

The 20th century was a period of revolutionary discoveries and developments, home to the foundations of all the technology we know and use today and without it the world would be a completely different place. Throughout the 20th century there was innovation and invention happening around every corner, but the major area of invention was the development of communication technology. The radio became a huge appliance in the early 1900s and played a significant role in both World War I and World War II, however like a range of other appliances, the radio used a vacuum tube. Vacuum tubes were used for processing binary code sent via radio wave to decipher what the message said, this principle was also applied to televisions and sound recording devices. The vacuum tube was a glass tube that contained 3 parts to it, an anode, grid and a cathode. When a charge was run...

Chemical engineering processes

Chemical engineering processes consist of disseverment stages in which the process streams are disunited and refined. In this disunion require physical principles predicated on differences in the properties of the ingredient in the stream. Heterogeneous cumulations consist of two or more phases which have different configuration. These cumulations consist of constituent that not take part in chemically and have limpidly detectable boundaries of disunion between the dissimilar phases. Constituent of such cumulation can be dissevered utilizing one or more congruous procedure. These disseverment processes include Gas-Liquid (vapor-liquid) disunion, Gas-Solid disseverment (vapor-solid), Liquid-Liquid disunion (immiscible), Liquid-Solid, and Solid-Solid disseverment etc. This disunion can be done by utilize the differences in density between the phases. Gravitational force or centrifugal force can be habituated to escalate the disunion. The disunion units can be either horizontal or vertical. The main techniques used to disunite the phases, and the constituent present in the phases are...

Popular Essays

logo

Emma Taylor

online

Hi there!
Would you like to get such a paper?
How about getting a customized one?